Posts

Doing double duty ...

Image
  The running backstays I fabricated out of Dyneema are normally attached on the outer sides of the cockpit coaming with lashings that run through D-rings and are tightened and secured with small cleats.  Their primary purpose is to support the mast at the point where the sail’s head load is (at times) transferred through the yard-spar to the mast’s battcar & T-track assembly. When I was out on my last sail, I started wondering if they might also serve as temporary lazy jacks when sailing in the fore-and-aft configuration.  Lazy jacks are great when lowering the mainsail as they prevent the sail from spilling all over the deck as it comes down.  The potential snafu is that they can snag the sail’s battens as it’s raised, possibly damaging the fabric.  What if you had lazy jacks could magically appear AFTER the mainsail has already been raised?   Quelle magnifique idée !   After a trip to Fisheries to acquire the necessary bits of hardware and faste...

Quick! Someone call Judy Garland ...

Image
  Now that the mast is up, the standing rigging connected and tuned, the running rigging attached and the sails hung, it was time to go sailing.  Today was as good a day in January as I was going to find to get out on the water: no rain, sunny, calm seas and light wind.  I double checked the halyards, sheets, put a cautionary reef in the mainsail and shoved off single-handed.  Although the temperature was not ideal, it was lovely being out on the water again, listening to the wind push a two ton vessel through the water.  As I approached the south end of Lake Washington, this appeared: I found the end of the rainbow; someone notify Dorothy and Toto! When I got back to the marina, I hooked up the running backstay and attached the yard-spar to the T-track battcar with the new oversized soft shackles I had previously fabricated.  Everything worked as expected.  Now that the yard-spar can be hoisted above the spreaders, it can be yawed at a greater angle t...

Stepping the mast ...

Image
  All the mast projects have been completed, and after one earlier abortive attempt (due to excessive swell), the day has arrived, the rain has departed and I had a small weather window of opportunity to get the mast back into an upright position.  This is how the day started: I had a wonderful cadre of patient, masked and willing volunteers assembled to assist, and after a quick safety briefing, the adventure began. Loren and I were able to get the mast up into the cradle, and then back into it’s retention baseplate.  After attaching the leverage pole and running the halyard over the pole and attaching it to the stemhead fitting, we were ready to actually raise the mast: We had Loren cranking on the winch, Dean stabilizing the leverage pole and Marco & Craig handling the jib halyard & topping lift to keep the mast centered over the boat on its way up.  We had just started cranking the mast up when the winch gave way and started coming apart.  Thankfully...

Mast projects ...

Image
  With the mast down, now is the time to complete the project list I’ve been compiling ever since I got the boat; some things are repairs and others are modifications needed for the final square-rigged configuration. HALYARD SHEAVES I noticed the first time I raised the mainsail that the halyard had excessive resistance which seemed to originate at the masthead.  Once the mast was down, I fully expected to find one or more of the halyard sheaves broken apart or missing, and the halyard riding on the hinge pins. Instead, once I removed the sheave box from the masthead, I discovered four intact sheaves, but sheaves that were way undersized; properly sized sheaves for 3/8” line should be about 3” diameter, but the existing sheaves were only 1” diameter.  Due to dimensional limitations of the masthead sheave box, the largest replacement sheaves I could use were 2” diameter.  Here are the old sheaves and new sheaves for comparison purposes: Locating and drilling the holes...

Don’t Bring Me Down...

Image
 If you are an ELO fan, you will know this song as one of their best.  I mean this in a figurative sense, and not a literal one, because the mast definitely does need to come down so I can complete some essential projects and repairs; I just hoped it would go smoothly, which is quite optimistic where boat projects are concerned. Since I have never lowered a mast on a Laguna 26 (or any boat for that matter!) I spent quite a lot of time looking at YouTube videos and lurking on boat forums, trying to get a handle on how the process works and what can potentially go wrong.  One of the first things I learned is that it’s best to do this when the boat is out of the water and on a nice stable platform; and of course I ignored this first recommendation (at my own peril) since this was not really an option for me seeing as I don’t have a trailer to haul the boat out onto.  I would just have to pick a calm day and hope some huge motor cruiser didn’t come along and generate a ...

Regis, I’ll use a lifeline...

Image
  The boat came with stainless steel lifelines, covered with some sort of hard plastic sheathing, which was standard for boats built back in the 80’s.  The plastic protects your hands (and the sails & rigging) from the meat hooks that develop over time as the individual strands of the stainless steel wire rope break.  The downside to this covering is that it hides these breaks so a visual inspection gives you very little idea of the wire’s integrity.  I had already encountered a couple meat hooks where the covering had worn away, exposing the wire rope (“Ouch!...what was that? Hey, why is my hand bleeding?”) and rust was seeping through the numerous cracks in the plastic covering; it was time to replace the lifelines. Since I have plans to replace the lower shrouds (also made of stainless steel wire) with single-braid Dyneema rope, I figured replacing the lifelines with this super-strong fiber would give me a chance now to get familiar with the tools and techniqu...